Back to bulletin

When the bridge closed

The detour that changed how we dispatched the westbound shipment.

By Company Archive

Diagram of the expanded depot network

The first winter after the second depot opened, ice closed the old bridge before daylight. Dispatch had thirteen pallets on the wrong side of the river, and there was doubt about whether the newer road would stay open until lunch.

The handwritten plan

The dispatcher drew a map on the back of an order form. It showed a service road, a turn beside a water tank, and a diner where the trucks could wait without leaving the road blocked. By noon the shipment was unloaded.

We still keep the order form. The turn is now marked on the official map. The diner has since closed, which the dispatcher regards as the greater loss.

More from the bulletin