When the bridge closed
The detour that changed how we dispatched the westbound shipment.
By Company Archive
The first winter after the second depot opened, ice closed the old bridge before daylight. Dispatch had thirteen pallets on the wrong side of the river, and there was doubt about whether the newer road would stay open until lunch.
The handwritten plan
The dispatcher drew a map on the back of an order form. It showed a service road, a turn beside a water tank, and a diner where the trucks could wait without leaving the road blocked. By noon the shipment was unloaded.
We still keep the order form. The turn is now marked on the official map. The diner has since closed, which the dispatcher regards as the greater loss.